Mine Land Reclamation
Through the Rural Abandoned Mine Program (RAMP) and the Bond Forfeiture Program more than 163 acres of land has been reclaimed in the county. Although great accomplishments have been made, the district is still working to further treat acid mine drainage seeps and reclaim additional land. The Conservation District continues to actively test and promote low cost effective treatment practices. Currently, two projects are being evaluated for effective acid treatment through the use of limestone sand and another project is testing the effects of inhibited sunlight on water treatment.
The Loyalsock Creek Watershed Association has joined in the fight to reclaim the Loyalsock Creek. In 2005, the Association joined with the Bureau of Abandoned Mines in an effort to design and install a passive treatment system in the Birch Creek Watershed, a tributary to Loyalsock Creek.
Treating Acid Mine Drainage Through Low Cost/Low Input Treatment Dealing with the scars of the past can be a difficult task, especially when those scars are from past coal mining operations. The area surrounding Lopez and Mildred in eastern Sullivan County, Pennsylvania is one of those such scars. Coal Mining in the area produced a unique coal that was neither hard nor soft. The term used to describe it is semi-bituminous and its use was found to be best suited for the manufacturing of automobile battery casings. After the boom era of minings was past, both towns became sleepy remnants of what used to be. One thing that has stayed with the area over all of this time is the effects of invasive nature of the old mining companies. Reclamation or protecting water quality was not even a consideration during the old coal boom days and therefore, nearly a century later we still have the misfortune of dealing with mine drainage problems, acidity problems in the local streams, culm piles riddling the landscape. All of which have stressed the region’s ability to naturally buffer acidic water and maintain a good level of water quality.
In an effort to wage our own war on these small areas, mainly mine seeps into water impoundments, we set out to test some KISS theories and see what difference we could make. By the way, KISS is Keep it Simple Stupid. Our first attempt at this method of treatment came in the mid 90’s when we set out by dosing some streams in the area with limestone sand. The problem with direct dosing is that it makes “slug” of treatment and does little for any type of longer term impact. We then decided to try keeping limestone sand piles up and away from the water and allow precipitation events carry the high CaCO3 to the water. This seems to do the trick. We have since placed several piles of the sand material on seep sights of old mine land and have found that it will affect pH and it will provide for a fairly decent lifespan. We have some piles that have been effectively adding to the buffering capability of a lake on White Ash land Association property for more than three years now. Prior to the placement of limestone sand, we performed a rather laborious task of applying lime directly to the lake to shock treat the less than desirable pH of around 4.9. Following the shock treatment and placement of limestone piles, pH has been maintained at readings from 5.3 – 5.7.
We became concerned with what effect time would have on our piles of limestone sand. One of the concerns was if it would crust over and prevent movement to the water. Our findings show that as long as there are deer in the area, crusting will not be an issue. Deer seem to love digging in the piles, maybe for the calcium, and serve as a good tool for preventing the crusting. At the same time, we also tested our theory of making vehicle traffic do some treatment for increasing pH. One of the tributaries to this same lake has a small permanent ford across it for members to access hunting ground. The placement of limestone (#4 stone) throughout the ford Our latest project was funded through the PA Association of Conservation District’s Chesapeake Bay Educational Mini-Grant. The project involved doing some maintenance on previously reclaimed mine land and setting the stage for yet another phase of limestone treatment. Grant funds and local support allowed for the sealing of an opening into the “mine pool” at a previously reclaimed site. The opening appeared several years after reclamation when settling of fill material occurred. The site was easily fixed by collecting a heavy clay loam soil from off site and compacting into the opening. Funding also provided resources to enhance another previously reclaimed site. This site, even though rather large, was being over taken in one area by undesirable invasive species, including Autumn Olive and Multiflora Rose. Following voluntary treatment of the site, to remove the invasive species, lime, fertilizer and a seed mix of birdsfoot trefoil, red clover and Kentucky blue grass was applied.
As the final component to this latest project, we saw the need to replenish our limestone treatment of past years. We set out on a slightly different path in search of a lower cost material and settled on testing the feasibility of using limestone dust. Limestone dust is basically a waste product of the quarry and can be obtained at very low prices. Price per ton for this project was $2.50. Limestone dust has the same CaCO3 content of 82% as its more expensive alternative of sand. With high transport costs, we are extremely interested in seeing if the dust will work as good and as long as the sand. This part of the project’s success will be seen over time, however, by applying minimal amounts of money, big changes and significant improvements can be made on abandoned mine lands. Financial and other support for these projects was provided by the PA Association of Conservation Districts, Inc., PA Department of Environmental Protection's Chesapeake Bay Program and the Eastern Coalition of Abandoned Mine Reclamation's Regional Watershed support initiative.
The Conservation District continues to play an active role in encouraging sound floodplain management throughout the county. A staff member has been assigned the responsibility to assist municipalities in the creation and adoption of ordinances pertaining to floodplains and floodplain development. Prior to the creation of the National Flood Insurance Program (NFIP), floodplain management as a practice was not well established - only a few States and several hundred communities actually regulated floodplain development. For many communities, the NFIP was the community's initial exposure to land use planning and community regulations. A community's agreement to adopt and enforce floodplain management ordinances, particularly with respect to new construction is an important element in making flood insurance available to home and business owners. Currently over 20,000 communities voluntarily adopt and enforce local floodplain management ordinances that provide flood loss reduction building standards for new and existing development. In an effort to encourage communities to establish sound floodplain management programs that go beyond the NFIP minimum requirements, the Community Rating System (CRS) was created. The CRS is an incentive program for communities that meet three criteria: 1.) reduce flood loss, 2.)facilitate an accurate insurance rating system and 3.) promote the awareness of flood insurance. The CRS incentive program provides reduced flood insurance costs based on the level of education and support the community provides to its residents. The Sullivan County Conservation District has agreed to be the organization responsible for working with local communities to encourage them to adopt and enforce ordinances that meet or exceed the minimum floodplain management requirements of National Flood Insurance Program
For more information, contact Randy Reibson, coordinator |
|||